Jak uzavřít / znovu otevřít 8D report
Strojový překlad z angličtiny. Zobrazen anglický originál.
An 8D report is usually closed when all its sections are completed. If needed, you can also close it without completing all the sections: you only get a message that not all the sections have been completed, asking whether you want to close it anyway.
-
Close the 8D. Click the Close 8D button in the first section of the report.

-
Check the closed date. Once you close the report, the closed date is visible in the description part (usually the first step of the 8D document).

-
Reopen the 8D if needed. To reopen the document, either click the Reopen 8D Report button or remove the Closed date in the settings of your document. To be able to reopen the 8D document, you have to be either the Raised by person or a document administrator.


8D report se obvykle uzavírá, když jsou dokončené všechny jeho sekce. V případě potřeby ho můžete uzavřít i bez dokončení všech sekcí: zobrazí se jen upozornění, že některé sekce nejsou dokončené, s dotazem, zda ho chcete přesto uzavřít.
-
Uzavřete 8D. V první sekci reportu klikněte na tlačítko Uzavřít 8D.

-
Zkontrolujte datum uzavření. Po uzavření reportu se datum uzavření zobrazí v části s popisem (obvykle v prvním kroku dokumentu 8D).

-
V případě potřeby 8D znovu otevřete. Dokument znovu otevřete buď tlačítkem Znovu otevřít 8D report, nebo odstraněním data v poli Uzavřeno v nastavení dokumentu. Znovu otevřít dokument 8D může jen osoba uvedená v poli Založil nebo administrátor dokumentu.


Potřebujete další pomoc?
Napište nám. V pracovní dny obvykle odpovídáme do hodiny.